Latest from the ground

Dated updates from our on-site team — construction milestones, approvals, and what's next.

  1. 15 October 2026

    Morning site round: roads, wall and services

    An early-morning round of Eastern Meadows on 15 October. The plotted land is levelled and grassing over, and the precast compound wall closes the boundary. The main internal road runs straight through the layout from a flagged entrance. Kerb blocks are stacked by the road edges, and aggregate is heaped across the site with chamber covers already set into the ground as the underground services work moves forward. The site office, overhead water tank and site-visit tent are in place for visitors.

    Early-morning view of levelled plot land at Eastern Meadows, with the precast compound wall and boundary flags along the far edge
    Open plotted land at Eastern Meadows seen from the site-visit tent, with a run of compound wall and the internal road beyond
    Levelled ground at Eastern Meadows with the compound wall, site office cabins and water tank in the distance
    Seating under the site-visit tent at Eastern Meadows, with stacked kerb blocks and earthwork on the internal roads behind
    Entrance road at Eastern Meadows lined with flags, visitor cars parked, and a freshly dug landscaping bed in the foreground
    Main internal road at Eastern Meadows lined with tall flags, with the road edge cut and shaped beside it
    Long run of precast concrete compound wall along the Eastern Meadows boundary
    Eastern Meadows site office cabins and overhead water tank beyond levelled plots and the compound wall
    Plot area at Eastern Meadows with aggregate heaps and chamber covers set into the ground for underground services
    Eastern Meadows layout with a gravel stockpile, site office and water tank, and the compound wall behind
    Wide morning view across the Eastern Meadows layout showing aggregate heaps, earthwork along the roads and the flagged boundary
  2. 8 October 2026

    Pipeline trenches cut and plot connections laid

    Underground pipeline work has spread across the layout. Along an internal road, two lines are going into the same deep trench: a ribbed double-wall corrugated main and a socket-jointed pipe with branch ports. A second trench runs along the inside of the compound wall, set out with a string line, and an excavator is cutting the next length. HDPE and precast concrete pipes are stacked in the stockyard beside the cement and aggregate, ready to go in. Past plot marker 80, the crew is jointing pipe and laying curved branch bends towards the plots, so every plot gets its own connection off the main line before the trenches are backfilled and the roads close over a finished underground network.

    Twin underground pipelines — a ribbed double-wall pipe and a jointed pipe with branch ports — laid side by side in a deep road-side trench at Eastern Meadows, with workers jointing the line and kerb blocks stacked on the bank
    Deep pipeline trench cut along the compound wall at Eastern Meadows, set out with a string line, with the overhead water tank and a crew stacking pipes in the background
    Pipe and material staging area at Eastern Meadows: stacks of black HDPE pipes, precast concrete pipes, cement bags and aggregate beside a kerbed road
  3. 8 October 2026

    Main avenue median built, jogging track taking shape

    The main avenue has taken its final shape. A long central median with rounded, whitewashed ends and a planting bed now divides two compacted metal carriageways, each finished with a straight kerb line. The flag avenue runs the whole length to the site pavilion. The same design continues onto the next stretch, where the road roller is parked for the next round of compaction, and at the junction an electric pole with cable drops already serves the kerbed corner. Along the boundary, the jogging track is taking shape: its path has been graded level and marked out with a double row of kerb stones beside the compound wall and the decorative grille frontage.

    Main avenue at Eastern Meadows with a whitewashed, rounded-end landscaped median running down the centre of a compacted metal road, kerb stones on both edges and flags lining the route
    Wide-angle view down the Eastern Meadows main avenue, with the planted central median, metalled carriageways and kerbed road edges stretching to the horizon under a blue sky
    Portrait view along the Eastern Meadows main avenue showing the whitewashed end of the central median and the compacted stone base course in the foreground
    Kerb-lined road beside the planted median at Eastern Meadows, with levelled plots, yellow plot markers, the flag avenue and the compound wall on the right
    Road junction at Eastern Meadows where the median avenue meets a cross road, with a kerbed corner plot and an electric pole fitted with insulators and cable drops
    Second stretch of the median road at Eastern Meadows, with the whitewashed median, kerbed edges, overhead power lines along the road and a road roller parked ahead
    Jogging track under construction along the compound wall at Eastern Meadows, its path marked out by a double row of kerb stones on graded red soil, with a decorative grille wall alongside
    Front-on view of the jogging track under construction at Eastern Meadows: a kerb-edged loop on levelled red soil, between the precast compound wall and the decorative grille boundary wall
  4. 20 August 2026

    Work under full swing across the layout

    Every trade is running at once on site — internal roads graded and flagged, plot markers set, kerb stones being laid along the road edges, storm-water drain channels cast, the drainage pipeline in its trench, precast compound wall panels standing and street-light poles up. Two walkthrough videos cover the layout end to end.

  5. 12 August 2026

    Internal roads metalled between finished kerbs

    With kerbing complete, the internal roads have received their stone base course, spread and compacted the full width between the kerb lines. Several stretches now read as finished roads rather than formations — straight kerb lines, an even metal surface and levelled plot land on either flank. The completed overhead water tank stands behind the new road, so the layout's road and water networks are converging on the same stretch of site.

    Completed internal road at Eastern Meadows with a compacted stone base laid between finished precast kerbs on both sides
    Straight run of kerbed internal road at Eastern Meadows with a compacted stone base, project flags flying and the compound wall along the far boundary
    Metalled internal road at Eastern Meadows seen down its length, kerbed on both sides with levelled plot land on either flank
    Kerbed and metalled internal road at Eastern Meadows with the overhead RCC water tank standing complete in the background to the right
    Kerb line running along a metalled road at Eastern Meadows with levelled plots, a manhole cover and the completed overhead water tank with its spiral staircase behind
  6. 10 August 2026

    Kerb stones set along the road edges

    Precast kerb stones were distributed along both edges of the main corridor and set to line and level. The drain lines run immediately behind the kerbs, so kerbing and backfilling are progressing together — by the end of this stretch both edges carry a drain with inspection chambers, servicing plots 32 through 41.

    Wide road corridor at Eastern Meadows lined with project flags, precast kerb stones laid out along both edges ready to be set
    Precast kerb stones being set along both sides of a levelled road at Eastern Meadows, with the open drainage trench running behind the right-hand kerb line
    Road corridor at Eastern Meadows with corrugated drainage pipe and brick chambers laid along both edges, plot markers 32, 38, 40 and 41 visible against the compound wall
  7. 8 August 2026

    Drainage mains and inspection chambers along the new roads

    The underground drainage network extended further along the road alignments this week. Pipe has been jointed and set to grade in open trench past plot markers 31, 32, 41 and 42, with circular brick inspection chambers built up over the line at each junction. The road formation alongside is already levelled and kerb stones are stacked on the shoulder, so the trenches close and the road edge follows immediately behind the pipe crew.

    Jointed drainage main laid in an open trench at Eastern Meadows, running past plot markers 31 and 32 with circular brick inspection chambers built over the line
    Drainage pipeline in a deep trench at Eastern Meadows alongside plot markers 41, 42 and 48, with brick inspection chambers spaced along the run and the compound wall behind
    Wide view of a road corridor at Eastern Meadows with the site engineer standing on the levelled formation and a drainage trench with laid pipe running along the right edge
    Workers along an open drainage trench at Eastern Meadows with the jointed pipe run visible below and a yellow RR boundary marker stone in the foreground
    Drainage pipe laid in a trench at Eastern Meadows with precast kerb stones stacked along the adjacent road edge and spare pipe stacked to the right
  8. 29 July 2026

    Overhead water tank almost complete

    The overhead water tank is close to done. The tank has been cast on its column staging, the spiral access staircase is in place, and the scaffolding is still up for the final finishing. Once it is stripped and cured, the tank ties into the layout's water distribution network so every plot draws from a completed overhead supply.

    Overhead RCC water tank at Eastern Meadows nearing completion, with the tank cast on its column staging, spiral access staircase in place and scaffolding still standing
  9. 26 July 2026

    More work on drainage

    The underground drainage network is being extended further into the layout. Trenches have been cut along the road alignments, the pipe main laid and jointed in continuous runs, and brick inspection chambers built over it at plots 90 and 96. Once the chambers cure, the trenches get backfilled and compacted so road formation can follow over a completed drainage line.

    Completed circular brick inspection chamber over the drainage line at plot marker 90, Eastern Meadows, with spare pipe stacks and flag-lined compound wall in the background
    Underground drainage pipe laid along an open trench at Eastern Meadows, with a mason seated on a newly built brick inspection chamber beside plot marker 96 and the compound wall behind
    Two workers finishing brickwork on a drainage chamber at Eastern Meadows while the jointed pipeline runs the length of the open trench behind them
  10. 23 July 2026

    Drainage pipeline laid along the road alignments

    Underground drainage work is in full swing across the layout. Trenches have been cut along the internal road alignments and the drainage pipeline is being laid and jointed in continuous runs past the marked plots, with kerb stones stacked alongside for the road works that follow. Once backfilled, every road in the layout sits on a completed underground drainage network.

    Long trench along a road alignment with black drainage pipe laid at the bottom, yellow R-marked road markers in the foreground and the compound wall behind at Eastern Meadows
    Close view down the trench with corrugated drainage pipe sections joined in a continuous run past numbered plot markers 87 and 88 at Eastern Meadows
    Drainage trench with pipe run stretching toward the site entrance, workers and material carts on the levelled road bed at Eastern Meadows
    Wide view of the drainage trench and pipe run beside a levelled plot area, with a yellow R road marker and flag posts at Eastern Meadows
    Drainage pipe run in an open trench with stacked kerb stones and plot markers 101 and 102 alongside the graded road at Eastern Meadows
  11. 21 July 2026

    Clearing the way for road formation

    Road corridors across the layout have been cleared, graded and compacted ahead of road laying. The 60ft road's central median stands ready with carriageways levelled on both sides, and the flag-lined avenues now trace every road alignment against the completed compound wall.

    Centre view down the 60ft road bed with the median and cleared carriageways on both sides at Eastern Meadows
    Graded 60ft road bed with the central median in place at Eastern Meadows, flags lining both sides
    Cleared and leveled road bed along the flag-lined avenue at Eastern Meadows, compound wall in the background
    Cleared road bed running past the flag avenue toward the compound wall at Eastern Meadows
    Retaining wall and cleared ground along a road alignment at Eastern Meadows, flag posts across the plots
    Wide view of cleared internal road beds and plotted land at Eastern Meadows with flag-lined avenues
  12. 7 June 2026

    Park area with decorative railing, entrance avenue and sales office

    The park area is taking shape with its decorative steel railing in place, and the grand entrance avenue with the on-site sales office is now ready. The project frontage is presentable to visitors, and site visits are open by appointment.

    Park area with decorative railing running along an internal road at Eastern Meadows
    Park area with decorative steel railing at Eastern Meadows, on-site sales office in the background
    Entrance with flag-lined avenue, neem tree and on-site sales office at Eastern Meadows
    Wide panorama of the flag-lined entrance avenue at Eastern Meadows
  13. 6 June 2026

    Internal roads, kerb stones and storm-water drains

    Internal roads have been graded and precast kerb stones with side storm-water drains are being lined along the avenue. The layout grid is now clearly defined on the ground, with flag-lined roads marking the spine.

    Graded internal road lined with the flag avenue at Eastern Meadows
  14. 4 June 2026

    60ft road divider and overhead water tank

    Vertical work has begun: the central road divider on the 60ft road is being built up in concrete block, and the overhead water tank has commenced with column and staging work. Both are key milestones toward a fully serviced layout.

    Close-up of the 60ft road divider (median) under construction at Eastern Meadows
    Overhead water tank under construction with scaffolding and crew at the tank ring at Eastern Meadows
  15. 2 June 2026

    Site formation, plotting and underground water sump

    Layout earthwork and plot demarcation are progressing, the internal road alignment has been formed, and the underground water sump has been cast. The flag avenue is installed along the spine road, putting the foundations for the layout's core infrastructure in the ground.

  16. 21 April 2026

    Overhead water tank foundation and compound wall masonry

    Reinforcement cage tied for the circular RCC base of the overhead water tank, and stone-masonry on the boundary / compound wall progressing along the site edge.

    Eastern Meadows — Overhead water tank foundation and compound wall masonry
    Eastern Meadows — Overhead water tank foundation and compound wall masonry
    Eastern Meadows — Overhead water tank foundation and compound wall masonry
    Eastern Meadows — Overhead water tank foundation and compound wall masonry
  17. 17 April 2026

    Septic tank construction

A visual record of the project

Every photo and video we've captured on site — newest first. Tap any image to zoom in.

Front-on view of the jogging track under construction at Eastern Meadows: a kerb-edged loop on levelled red soil, between the precast compound wall and the decorative grille boundary wall
The jogging track, front-on: the kerb lines that will edge the track run in a loop over levelled red soil, with the precast compound wall on one side and the decorative grille boundary on the other.
Jogging track under construction along the compound wall at Eastern Meadows, its path marked out by a double row of kerb stones on graded red soil, with a decorative grille wall alongside
The jogging track is taking shape along the boundary. Its path has been graded level and marked out with a double line of kerb stones that follows the compound wall round a rounded corner. The front boundary carries a decorative grille wall.
Pipe being jointed in the trench past plot marker 80, with curved branch bends laid out along the bank towards the plots, so each plot gets its own connection off the main line.
The pipeline crew at work along the trench, with HDPE pipe lengths lined up on the bank and the finished metalled road running just beyond the spoil heap.
From the pipe stockyard to the trench face: stacked HDPE pipes, the overhead water tank, and an excavator cutting a fresh trench along the compound wall while the site team checks the alignment.
Walking the boundary trench: the crew dresses the trench floor to the string line while pipes wait on the bank, ready to be lowered in.
Road junction at Eastern Meadows where the median avenue meets a cross road, with a kerbed corner plot and an electric pole fitted with insulators and cable drops
At the junction, the median avenue meets a cross road around a fully kerbed corner. An electric pole fitted with insulators and cable drops stands at the corner, part of the layout's power distribution.
Kerb-lined road beside the planted median at Eastern Meadows, with levelled plots, yellow plot markers, the flag avenue and the compound wall on the right
One carriageway alongside the planted median: a straight kerb line separates the metalled road from levelled plots, each marked with a yellow plot marker, and the precast compound wall closes the layout beyond.
Portrait view along the Eastern Meadows main avenue showing the whitewashed end of the central median and the compacted stone base course in the foreground
Standing at the head of the median: the compacted stone base course of the carriageway in the foreground, the whitewashed median nose and the flag-lined avenue running ahead.
Wide-angle view down the Eastern Meadows main avenue, with the planted central median, metalled carriageways and kerbed road edges stretching to the horizon under a blue sky
A wide-angle look down the full length of the avenue: twin metalled carriageways, the planted median between them, kerbed edges on both sides and levelled plots beyond.
Second stretch of the median road at Eastern Meadows, with the whitewashed median, kerbed edges, overhead power lines along the road and a road roller parked ahead
The same median design continues on the next stretch of the road, kerbed on both sides, with the overhead power line running alongside and the road roller parked ahead for the next round of compaction.
Deep pipeline trench cut along the compound wall at Eastern Meadows, set out with a string line, with the overhead water tank and a crew stacking pipes in the background
A deep trench has been cut right along the inside of the compound wall and set out with a string line for grade. Pipes are stacked at the far end, and the overhead water tank stands behind the crew.
Pipe and material staging area at Eastern Meadows: stacks of black HDPE pipes, precast concrete pipes, cement bags and aggregate beside a kerbed road
Material for the next phase of underground work is staged on site: stacks of black HDPE pipe, precast concrete pipes along the kerb, cement bags and aggregate, ready for the trenches being cut nearby.
Main avenue at Eastern Meadows with a whitewashed, rounded-end landscaped median running down the centre of a compacted metal road, kerb stones on both edges and flags lining the route
The main avenue now reads as a finished boulevard: a long, rounded-end central median with a planting bed, compacted metal carriageways on both sides, kerb stones set along each edge and the flag avenue running all the way to the site pavilion.
Twin underground pipelines — a ribbed double-wall pipe and a jointed pipe with branch ports — laid side by side in a deep road-side trench at Eastern Meadows, with workers jointing the line and kerb blocks stacked on the bank
Two pipelines laid in the same trench along an internal road: a double-wall corrugated main beside a socket-jointed line fitted with branch ports for plot connections. The crew is jointing and aligning the run, precast kerb blocks are stacked on the bank for the road edge, and the flag-lined roads and overhead water tank stand in the background.
Eastern Meadows — 5 Sept 2026
Eastern Meadows · 5 Sept 2026
Eastern Meadows — 5 Sept 2026
Eastern Meadows · 5 Sept 2026
Eastern Meadows · 5 Sept 2026
Eastern Meadows — 5 Sept 2026
Eastern Meadows · 5 Sept 2026
Eastern Meadows · 5 Sept 2026
Eastern Meadows — 5 Sept 2026
Eastern Meadows · 5 Sept 2026
Eastern Meadows — 5 Sept 2026
Eastern Meadows · 5 Sept 2026
Eastern Meadows — 5 Sept 2026
Eastern Meadows · 5 Sept 2026
Eastern Meadows — 5 Sept 2026
Eastern Meadows · 5 Sept 2026
Eastern Meadows — 5 Sept 2026
Eastern Meadows · 5 Sept 2026
Eastern Meadows · 5 Sept 2026
Along the road edge — drainage pipeline in its trench, precast wall panels standing, street-light poles up and the team setting kerb stones as visitors walk the layout.
A full walk across the site with work under full swing — graded internal roads, plot markers in place, kerb stones going down, drain channels cast and the compound wall closing the boundary.
Kerb line running along a metalled road at Eastern Meadows with levelled plots, a manhole cover and the completed overhead water tank with its spiral staircase behind
Kerb line, road surface, drain manhole and overhead tank all in one frame — the layout's services are taking final shape.
Kerbed and metalled internal road at Eastern Meadows with the overhead RCC water tank standing complete in the background to the right
Roads and water infrastructure coming together — the overhead tank stands finished beyond the new road.
Metalled internal road at Eastern Meadows seen down its length, kerbed on both sides with levelled plot land on either flank
Looking down the finished stretch — kerbs true on both sides and the base course evenly compacted.
Straight run of kerbed internal road at Eastern Meadows with a compacted stone base, project flags flying and the compound wall along the far boundary
A full straight run of road, kerbed on both sides and metalled end to end.
Completed internal road at Eastern Meadows with a compacted stone base laid between finished precast kerbs on both sides
Metal base laid and compacted between finished kerbs — this stretch is ready for its wearing course.
Road corridor at Eastern Meadows with corrugated drainage pipe and brick chambers laid along both edges, plot markers 32, 38, 40 and 41 visible against the compound wall
Both edges of this stretch now carry a drain line with chambers — plots 32 through 41 are fully serviced.
Precast kerb stones being set along both sides of a levelled road at Eastern Meadows, with the open drainage trench running behind the right-hand kerb line
Kerbing under way on both sides — the drain line sits behind the right kerb before backfilling.
Wide road corridor at Eastern Meadows lined with project flags, precast kerb stones laid out along both edges ready to be set
Kerb stones distributed along both edges of the main corridor, ready to be set to line and level.
Drainage pipe laid in a trench at Eastern Meadows with precast kerb stones stacked along the adjacent road edge and spare pipe stacked to the right
Drainage in the ground and kerb stones already stacked alongside — the road edge is next in line.
Workers along an open drainage trench at Eastern Meadows with the jointed pipe run visible below and a yellow RR boundary marker stone in the foreground
Crew working the trench line — pipe jointed and set to grade before the trench is closed.
Wide view of a road corridor at Eastern Meadows with the site engineer standing on the levelled formation and a drainage trench with laid pipe running along the right edge
Road corridor levelled and ready, with the drainage main tracking the right-hand edge of the alignment.
Drainage pipeline in a deep trench at Eastern Meadows alongside plot markers 41, 42 and 48, with brick inspection chambers spaced along the run and the compound wall behind
The same drainage run continuing past plots 41 and 42 — chambers set at each junction along the alignment.
Jointed drainage main laid in an open trench at Eastern Meadows, running past plot markers 31 and 32 with circular brick inspection chambers built over the line
Trunk drain laid past plots 31 and 32, with inspection chambers raised over the line before backfilling.
Overhead RCC water tank at Eastern Meadows nearing completion, with the tank cast on its column staging, spiral access staircase in place and scaffolding still standing
The overhead water tank is almost complete — tank cast on its staging with the spiral access stair in place.
Completed circular brick inspection chamber over the drainage line at plot marker 90, Eastern Meadows, with spare pipe stacks and flag-lined compound wall in the background
Inspection chamber at plot 90 built up over the trunk drain line, with the next stretch of pipe stacked and ready along the road edge.
Underground drainage pipe laid along an open trench at Eastern Meadows, with a mason seated on a newly built brick inspection chamber beside plot marker 96 and the compound wall behind
Drainage line running past plot 96 — pipe laid, jointed and the inspection chamber raised course by course before backfilling.
Two workers finishing brickwork on a drainage chamber at Eastern Meadows while the jointed pipeline runs the length of the open trench behind them
Chamber brickwork and mortar finishing in progress — the jointed drainage main runs the full length of the trench behind.
Underground drainage installation running past the marked plots — the layout's utility backbone taking shape.
Drainage works progressing along the internal roads — trenching and pipe laying in motion.
Drainage pipe run in an open trench with stacked kerb stones and plot markers 101 and 102 alongside the graded road at Eastern Meadows
Pipe laying near plots 101–102 with kerb stones stacked for the road works that follow the drainage line.
Wide view of the drainage trench and pipe run beside a levelled plot area, with a yellow R road marker and flag posts at Eastern Meadows
Drainage network extending along the internal road, keeping every plot connected to the underground system.
Walkthrough along the drainage trench — pipe run, jointing and trench line in one continuous view.
Close view down the trench with corrugated drainage pipe sections joined in a continuous run past numbered plot markers 87 and 88 at Eastern Meadows
Pipe sections joined into a continuous drainage run past plots 87–88, with fittings staged along the trench edge.
Drainage trench with pipe run stretching toward the site entrance, workers and material carts on the levelled road bed at Eastern Meadows
Crew progressing the drainage line along the levelled road bed — fittings lined up ahead of the next stretch.
Long trench along a road alignment with black drainage pipe laid at the bottom, yellow R-marked road markers in the foreground and the compound wall behind at Eastern Meadows
Drainage pipeline laid along the road alignment — trench cut, pipe positioned, ready for jointing and backfilling.
Centre view down the 60ft road bed with the median and cleared carriageways on both sides at Eastern Meadows
Looking down the 60ft road: median in place, carriageways cleared on both sides for road formation.
Retaining wall and cleared ground along a road alignment at Eastern Meadows, flag posts across the plots
Ground cleared along the retaining wall as road alignments are prepared.
Wide view of cleared internal road beds and plotted land at Eastern Meadows with flag-lined avenues
Internal road beds cleared and compacted across the layout, avenues marked by flags.
Cleared road bed running past the flag avenue toward the compound wall at Eastern Meadows
Road corridor cleared along the flag avenue, compound wall complete in the background.
Cleared and leveled road bed along the flag-lined avenue at Eastern Meadows, compound wall in the background
Road bed cleared and leveled along the flag avenue, ready for road formation.
Graded 60ft road bed with the central median in place at Eastern Meadows, flags lining both sides
60ft road bed graded on both sides of the central median, cleared for road formation.
Wide panorama of the flag-lined entrance avenue at Eastern Meadows
Panorama of the entrance avenue.
Entrance with flag-lined avenue, neem tree and on-site sales office at Eastern Meadows
Entrance with the flag avenue, neem tree and on-site sales office.
Walkthrough of the park area with decorative railing and the entrance.
Park area with decorative steel railing at Eastern Meadows, on-site sales office in the background
Park area with decorative railing, with the on-site sales office behind.
Park area with decorative railing running along an internal road at Eastern Meadows
Park area with decorative railing along an internal road.
Graded internal road lined with the flag avenue at Eastern Meadows
Graded internal road along the flag avenue.
Precast kerb stones and side storm-water drains being laid along an internal road.
Overhead water tank under construction with scaffolding and crew at the tank ring at Eastern Meadows
Overhead water tank under construction, crew working at the tank ring.
Close-up of the 60ft road divider (median) under construction at Eastern Meadows
Central road divider on the 60ft road under construction.
Spine road formation with utility and reinforcement lines going in, flag avenue alongside.
Plotted land with the 60ft road divider in place and the underground water sump under construction.
Eastern Meadows — 21 Apr 2026
Eastern Meadows · 21 Apr 2026
Eastern Meadows — 21 Apr 2026
Eastern Meadows · 21 Apr 2026
Eastern Meadows — 21 Apr 2026
Eastern Meadows · 21 Apr 2026
Eastern Meadows — 21 Apr 2026
Eastern Meadows · 21 Apr 2026
Eastern Meadows — 21 Apr 2026
Eastern Meadows · 21 Apr 2026
Eastern Meadows — 21 Apr 2026
Eastern Meadows · 21 Apr 2026
Eastern Meadows — site
Eastern Meadows — site
Eastern Meadows — site
Eastern Meadows — site
Eastern Meadows — site
Eastern Meadows — site
Eastern Meadows — site
Eastern Meadows — site
Eastern Meadows — site
Eastern Meadows — site
Early-morning view of levelled plot land at Eastern Meadows, with the precast compound wall and boundary flags along the far edge
Morning at Eastern Meadows: the plotted land is levelled and grassing over, with the precast compound wall closing the boundary behind it.
Open plotted land at Eastern Meadows seen from the site-visit tent, with a run of compound wall and the internal road beyond
Looking out from the site-visit tent across open plots towards the compound wall and the internal road.
Levelled ground at Eastern Meadows with the compound wall, site office cabins and water tank in the distance
Levelled plot area with the compound wall, site office and overhead water tank in the background.
Seating under the site-visit tent at Eastern Meadows, with stacked kerb blocks and earthwork on the internal roads behind
The site-visit seating area is set up under the tent, with kerb blocks stacked and ready for the road edges behind it.
Entrance road at Eastern Meadows lined with flags, visitor cars parked, and a freshly dug landscaping bed in the foreground
At the entrance: the approach road is flagged and visitors park right at the gate, with the landscaping bed dug and shaped alongside.
Main internal road at Eastern Meadows lined with tall flags, with the road edge cut and shaped beside it
The main internal road runs straight through the layout, lined with flags, with the verge cut and shaped beside it.
Long run of precast concrete compound wall along the Eastern Meadows boundary
Precast compound wall running along the boundary, fully enclosing the layout.
Eastern Meadows site office cabins and overhead water tank beyond levelled plots and the compound wall
Site office and overhead water tank on the far side of the layout, beyond the levelled plots.
Plot area at Eastern Meadows with aggregate heaps and chamber covers set into the ground for underground services
Aggregate is heaped out across the layout and chamber covers are set into the ground, as the underground services work moves forward.
Eastern Meadows layout with a gravel stockpile, site office and water tank, and the compound wall behind
Gravel stockpiled on site, with the site office and water tank behind, ready for the next stretch of road and services work.
Wide morning view across the Eastern Meadows layout showing aggregate heaps, earthwork along the roads and the flagged boundary
Wide view across the layout: aggregate heaps and earthwork along the road lines, with the flagged boundary all around.
1 / 1